31/07/2015
OPTICHROME BLOG
Hot off the press
From the factory floor as the Heidelberg XL75-L5 is unloaded
From the factory floor as the Heidelberg XL75-L5 is unloaded
The assembly of our latest equipment investment is going well and on schedule.
This video was shot as the Heidelberg XL75-L5 is unloaded at Optichrome and carefully manouvered to its permanent location on our factory floor.
Can’t see video player? Click here