OPTICHROME BLOG Hot off the press

From the factory floor as the Heidelberg XL75-L5 is unloaded

From the factory floor as the Heidelberg XL75-L5 is unloaded

The assembly of our latest equipment investment is going well and on schedule. 

This video was shot as the Heidelberg XL75-L5 is unloaded at Optichrome and carefully manouvered to its permanent location on our factory floor. 

Can’t see video player? Click here